Thu 1 Oct · PourThu 1 Oct, 6:10 PM · Two tasks the evening of the pour
Both results are tasks before the cubes leave the site.
The first-floor slab at Velachery School takes 46 m³ of M25 from Alpha1’s own plant. That evening Meera Nair, who heads projects, raises two tasks for Vikram Iyer, who runs the plant: the 7-day result by 8 October and the 28-day result by 29 October. Arjun Das, the site engineer, is copied on both.
2 tasks · due 8 Oct and 29 Oct · Arjun copied